Fit-Out Design in Dubai - Kenania Inventive Arts

Dubai · Commercial Fit-Out

Fit-Out Design in Dubai

Offices, restaurants, shops and clinics from shell-and-core to opening day: concept, 3D, approval-ready drawings and a BOQ your fit-out contractor can price. Designed in Dubai, with the authority stage planned from day one.

4

sectors: office, F&B, retail, clinic

12+

years designing across the Gulf

AED 73

per m² — full design package, from

DM · DCD · DEWA

requirements built into the drawing set

Fit-out in Dubai is an approvals project as much as a design project

Every commercial unit in Dubai has at least three parties who must sign off before work starts: the landlord or building management, Dubai Municipality (or the free-zone authority — DDA, Trakhees, DMCC, DIFC, JAFZA — depending on where the unit sits), and Dubai Civil Defence for fire and life safety. Restaurants add Food Safety, clinics add the Dubai Health Authority, and anything touching power or water passes through DEWA. Miss one and the fit-out stops.

Our drawing sets are prepared with that sequence in mind. Layouts respect travel distances and exit widths from the start; ceilings are coordinated with sprinklers, smoke detectors and AC; kitchens and treatment rooms are planned to the inspecting authority’s checklist. Your contractor or consultant submits, and we respond to comments until the set is approved — instead of redesigning after a rejection.

Kenania is a design studio, not a contractor. That keeps our advice independent: we design for your brand and your budget, then brief the contractor you choose, review their shop drawings and visit the site at milestones. Our published fee starts at AED 73 per square metre for the full design package.

What a fit-out set includes

  • Demolition and proposed layout plans with furniture
  • Reflected ceiling plans coordinated with fire and AC
  • Electrical, data, lighting and plumbing layouts
  • Elevations, joinery and finishes details
  • Finishes schedule and bill of quantities (BOQ)
  • Authority-format sheets for DM / DCD / landlord submission

Fit-out sectors we design

Each sector has its own authority checklist. We have designed for all four.

Office fit-out

Reception, open-plan, meeting rooms, executive suites and pantries for Business Bay, DIFC, JLT, Dubai Internet City and free-zone offices.

Office fit-out guide

Restaurant & café fit-out

Front-of-house design with the kitchen, extraction, grease trap and Food Safety requirements planned into the layout, not added later.

Hospitality case study

Retail & showroom fit-out

Mall units and street shops with display, lighting and shopfront designed to the mall’s tenant criteria.

Retail lighting design

Clinic & medical fit-out

Patient flow, privacy, infection-control finishes and DHA-friendly room schedules for dental, aesthetic and general clinics.

Space planning approach

Shell-and-core to turnkey design

From an empty unit with a DEWA connection to a complete drawing set and BOQ ready for tender.

What drives the cost

Renovation & rebranding

Refreshing an existing unit for a new brand, with minimal downtime and minimal authority resubmission.

Reception redesign project

Commercial interiors from our portfolio

Office, hospitality, retail and wellness spaces that share the Dubai fit-out brief.

Corporate office interiors

Corporate office interiors

Workplace design balancing open collaboration with focus areas and a strong reception.

Restaurant interior design

Restaurant interior design

A dining room planned around seating yield, kitchen flow and the brand experience.

Spa & wellness interiors

Spa & wellness interiors

Treatment rooms and wet areas with finishes and services specified for the Gulf.

How a Dubai fit-out design runs

From unit handover to approved drawings in four stages.

01

Unit survey & brief

We survey the unit, collect the landlord’s fit-out guide and the as-built drawings, and confirm scope, fee and timeline in writing.

02

Concept & 3D

Layout options tested against exits, services and your headcount or cover count, then photorealistic 3D of the key views.

03

Authority drawing set

Full fit-out set coordinated with fire, AC and electrical, formatted for DM, DCD and landlord submission by your contractor.

04

Tender & site support

BOQ for contractor pricing, shop-drawing review and milestone site visits until handover.

Fit-out design fees in Dubai

Published “starting from” rates. The final fee follows the written scope; units under 80 m² are quoted as a fixed price.

ScopeStarting fromIncludes
Full fit-out design packageAED 73 / m² (USD 20)Concept, 3D visuals, authority drawing set, finishes schedule, BOQ
3D visualisation onlyAED 33 / m² (USD 9)Photorealistic renders of an approved layout
Drawing set onlyAED 44 / m² (USD 12)Authority-ready execution set from an existing concept
Site visits & shop-drawing reviewPer visit / per weekPriced in the proposal according to programme

Authority fees, consultant stamping and contractor NOCs are charged at cost and listed separately. Fit-out construction cost is quoted by your contractor against our BOQ.

Fit-out questions we hear in Dubai

Do you do the fit-out construction as well?

No. We are the design studio. We prepare the approval-ready set and BOQ, brief the contractor you choose, review shop drawings and visit the site. That keeps our design and cost advice independent of the builder.

Which approvals does a Dubai fit-out need?

Typically the landlord’s NOC, Dubai Municipality or the relevant free-zone authority, and Dubai Civil Defence. Restaurants add Food Safety, clinics add DHA, and DEWA covers electrical and water. Our set is prepared for all of them.

How long does fit-out design take?

A 200 m² office typically needs 2 weeks for concept and 3D and 2–3 weeks for the authority set. Restaurants and clinics take longer because of kitchen and medical coordination.

Can you work with our landlord’s fit-out guidelines?

Yes. We ask for the building’s fit-out manual at the start and design within it, so the landlord review does not stall the programme.

Do you design fit-outs outside Dubai?

Yes, across the UAE and in Saudi Arabia, with the drawing set adapted to each authority. See our Riyadh, Jeddah and Dammam pages.

Plan your Dubai fit-out

Send the unit plan, the landlord’s fit-out guide and a short brief. You will get a scoped proposal with a fixed design fee within two working days.